PUBLIC NOTICE OF FINAL ACCEPTANCE HEARING
County Ditch 10
Please Take Notice: The Drainage Authority of Lyon County Ditch 10 (CD 10) will hold a Final Acceptance Hearing on the Improvement and Redetermination of Benefits for CD 10. The Engineer’s Detailed Final Report of Expenses and the property owner’s assessments for CD 10 has been filed and are prepared for review.
The hearing will be held on Tuesday, July 26, 2016, at 11:00 a.m. in the Joint Law Enforcement Center Training Room, 611 West Main Street, Marshall, MN 56258.
A brief description of the Improvement to CD 10 consists of the following:
Enlarging of the existing main tile approximately in the same location as the existing County Ditch 10 and a wetland restoration in the NW 1/4 of section 27.
Main: All sections are in Coon Creek Township. Starting in the NE 1/4 of Section 26 with the installation of a 24″ reinforced concrete pipe under CSAH #2 connected to a 66″ manhole to work in conjunction with an existing 30″ culvert that is in place under CSAH #2. The manhole will be installed on the south side of CSAH #2. That pipe is connected to a 36″ tile proceeding westerly about 4800′ to the NW 1/4 of the NW 1/4 of Section 26, south of the CSAH #2 R/W. From that point there is a 30″ tile proceeding in a westerly direction beneath 150th Avenue into the NE 1/4 of Section 27, then turning southwest and running for 732′ then turning west and running for 700′. At this point the tile will be
reduced to 24″ and run through the NE 1/4. of the NW 1/4 of Section 27 before the tile will be reduced to 18″ and run under CSAH #2 into the SW 1/4 of Section 22 north of the R/W line for CSAH #2 and head West for 1200′ to the end of the Main tile. In addition, 1200′ east of the
intersection of CSAH #13 and CSAH #2, a 24″ tile will be outlet on CSAH #2 into an existing 24″ centerline culvert. That line will consist of 1500′ of 24″tile that will terminate in the West R/W line 500’north of the intersection of CSAH #13 and CSAH #2. This tile will be receiving water from Sections 21 and 28 in Coon Creek Township and placing water in a CRP wetland in part of the NW 1/4 of Section 27.
The affected properties and landowners are as follows:
* Portions of Section 21, 22, 23, 26, 27, 28 of Coon Creek Township in Lyon County. Landowners are: Ronald & Pamela Thooft, Elise Lanoue, Steven & Leland Bush, David Kremer LLC, Carey & Cheryl Johnson, Steve & Nancy Thooft, Alan & Jane Hansen Life Estate, Charles & Rita Klukas, Larry Olson, Willard Gifford, Edward & Sara Kurtz, Paul &
Elizabeth Henriksen, Terri Williams, James & Karolyn Barron, Marian Livingston, Troy Thooft, Robert & Deborah Michel, Dolan & Eyvonne Johnson, Reed & Angela Andries, Allan & Judy Klukas, Gregory &
Kristen Hurst, Lyon County, and Coon Creek Township.
Any party objecting to the acceptance of the contract may appear and be heard.
If you need further information regarding this hearing, please contact the Lyon County Ditch Inspector Todd Hammer at 507-532-8208.
E.J. Moberg, Lyon County Auditor/Treasurer